Data Center Power and Cooling Requirements Calculator

Author(s): Melanie Davy

1 Download

Get Instant Access
To unlock the full content, please fill out our simple form and receive instant access.

Upfront estimations are necessary to capture current and future business needs, develop a high-level budget, and align facility costs and capacity with the needs of the enterprise.

Use this tool before to correctly estimate both current and future:

  • Power requirements
  • Cooling requirements
  • Standby power requirements

By gathering and understanding this information, IT can avoid cost overruns and capacity issues during construction.

View the Complete Blueprint:

Build a Data Center

Building a data center is a complex and expensive challenge requiring specific design and engineering skills.

Related Content

Visit our Exponential IT Research Center
Over 100 analysts waiting to take your call right now: 1-519-432-3550 x2019