Determining cooling requirements is an important aspect of planning and design for a data center renovation project but can be a difficult number to estimate. Use this tool to:
- Estimate the total existing and future cooling load requirements.
- Estimate the size of cooling device required.
By understanding the information and calculations involved in estimating cooling requirements, IT can ensure that the data center renovation project defines enough cooling to protect the data center’s contents and support both current and future needs.
This downloadable tool is associated with the research note, Estimating Data Center Cooling Requirements: Just the Right Amount of Cool. Use this tool in conjunction with the Data Center Power Requirements Calculator