Templates & Policies

Data Center Renovation Contractor Scripted Interview

Data center facilities call for specific industrial design and engineering requirements to meet needs for fire-protection, power provisioning, stand-by power, cooling,...

Data Center Renovation Contractor Reference Checklist

Data center renovation projects can lead to unexpected complexity and require the assistance of mechanical engineers or contractors in planning and implementation stages....

Fire Protection & Suppression Engineer Selection Criteria Checklist

While preliminary decisions regarding the types of fire protection and suppression required in the data center can be made by IT, the final decision and selection process...

Functional Testing Software Evaluation Form

Scoring vendor solutions solely based on their presentations or marketing material provides only a limited picture of a software solution. Due diligence must be performed...

North American Electronic Waste Laws

A number of legislative issues can pose a liability to organizations that fail to properly dispose of obsolete computers and other electronic equipment. Use this document...

Data Center Contractor Selection Scripted Interview

Data center facilities call for specific industrial design and engineering requirements to meet needs for fire-protection, power provisioning, stand-by power, cooling,...

Data Center Contractor Scripted Interview Scorecard

When meeting with potential contractors for the build of a new data center, organizations should use a scripted interview to aid in the decision making process. Each...

Data Center Contractor Reference Check Checklist

Building a data center is a complex and expensive project that requires the assistance of contractors, especially in the design and planning stages. Selecting the right...

Data Center Site Selection and Security Checklist

Whether it is an existing building or a new construction site, IT must cover due diligence by completing a site evaluation for each potential location. Use a building...

Data Center Fire Protection and Suppression Vendor Criteria Checklist

While preliminary decisions can be made by IT, the final decision and selection process should be done by consulting a fire engineer. However, not all fire engineers are...
Visit our Exponential IT Research Center
Over 100 analysts waiting to take your call right now: 1-519-432-3550 x2019
GET HELP
Contact Us